Event Calibration Pvt. Ltd.

online
Hi,
How can I help you ?

PLC & CSV VALIDATION

It is Regulatory requirement to test the quality of steam periodically. We undertake the job and provide reports which compiles to EN 285/HTM 2010 Guidelines for Sterilizer Validation.

Scope of Work:
  • PLC base Control system.
  • PLC base Control Systems with H MI/MM I user interface Camera System.
  • PLC base Control Systems with SCADA.
  • Micro-Controller base control system.
  • Operating Software for the SCADA.
  • Equipment Validation (Incubator, Stability, etc..)
Computerized System Validation Services Deliverables

Qualification Doc.: GxP, RA, GAP, CSVP, IQ, OQ, PQ ,(lf required),VSR , Test cases (if required) etc.
Re-Qualification Doc. : RA, Requalification Protocol (Including IQ,OQ,PQ ), Test cases (if required) etc.
Re-Validation Doc. : Performance Verification Protocol (Including IQ,OQ), Test cases (if required)

Work Flow For Computer System Validation
  • Master Validation Plan
  • List out Plc/scada/control System
  • Collection of Raw Data Information and Required Reference Documents
  • Gxp Assessment
  • Risk Assessment
  • Gap Assessment
  • Generation of Protocols/ reports (IQ, OQ & PQ)
  • Execution of Protocols/reports (IQ, OQ & PQ) & Compiling
  • Acceptance Criteria
  • Deficiency Report
  • Change Control
  • Corrective Action & Preventive Action
  • Final Submission of All Reports
  • Validation Summary Report
View More